8/27 |
HW0: Introductions |
9/1 |
|
9/3 |
|
9/8 |
|
9/10 |
Lab 1: Datacenter Temperature Control
HW1 posted
- Due 9/24 |
9/15 |
|
9/17 |
Lab 2 Lab 1 Deliverables Due (xml model + documentation)
Google Data Centers (for interested readers) |
9/22 |
|
9/24 |
HW 1 due at 11:59PM (Hand into 545H Cory or email).
HW 2 posted - Due 10/13. |
9/29 |
Lab 3 |
10/1 |
|
10/6 |
Project Proposals Due. |
10/8 |
|
10/13 |
HW 2 due at 11:59PM (Hand into 545H Cory or email). |
10/15 |
HW 3 Posted - Due 10/29/2009 |
10/20 |
|
10/22 |
|
10/27 |
|
10/29 |
|
11/3 |
|
11/5 |
|
11/10 |
|
11/12 |
|
11/17 |
|
11/19 |
Project Progress report due. |
11/24 |
|
11/26 |
No lecture. Thanksgiving.
|
12/1 |
|
12/3 |
|
12/8 |
|